The Capital Hill Battery Energy Storage System (CHBESS), situated adjacent to the Transgrid Queanbeyan substation, required a robust earthing system design and testing. This critical infrastructure needed protection against local 132kV and 33kV faults, as well as faults from the adjacent Transgrid Queanbeyan transmission substation and the Oaks Estate Essential Energy substation.
Zero Sequence Earthing tackled the project with a thorough approach. We conducted earthing system design, electromagnetic field (EMF) modelling and earthing system current injection testing (CIT). Our team meticulously modelled the local buried earth grid and interconnected assets to assess various fault scenarios, ensuring the CHBESS was shielded from potential electrical hazards.
The Capital Hill BESS Earthing Design and Testing project delivered robust protection for the CHBESS. By addressing a wide range of fault scenarios and utilizing advanced modeling and testing techniques, our solution enhanced the safety and reliability of this vital energy storage system. Zero Sequence Earthing’s expertise in earthing design and testing once again contributed to the secure operation of critical infrastructure.
Discover more about Zero Sequence Earthing. Access our Capability Statement by clicking the link for valuable insights.
Zero Sequence Earthing is a specialist electrical engineering consultancy offering earthing and lightning protection design and testing services.
Quick Links
Services
Get In Touch
Newcastle | Melbourne | Adelaide
Fill out the form below to discover more about Zero Sequence Earthing. Access our Capability Statement by clicking the link for valuable insights.